News Center

CEDRI Design Thermal Process System for SINOVAC Covid-19 Vaccine Production Workshop

Release time:2020-12-11 Article source: Reading times: A+ A A-

Recently, the supporting boiler room, which is designed for the Covid-19 vaccine production workshop of SINOVAC Daxing Biomedical Base by China Electric Design and Research Institute Co., Ltd.(abbreviated as CEDRI, a subsidiary of CNEEC), has been successfully completed. After put into operation, the boiler room will provide auxiliary process steam to the SINOVAC Covid-19 vaccine production workshop to ensure the safe mass production of vaccines.

SINOVAC vaccine production workshop is located in Beijing Daxing Biomedical Base. The design scope of CEDRI includes thermal system, equipment and pipeline layout and the related electrical, architectural, structural, hydraulic, HVAC and other systems for the steam boiler SINOVAC vaccine production workshop is located in Beijing Daxing Biomedical Base. The design scope of CEDRI includes thermal system, equipment and pipeline layout and the related electrical, architectural, structural, hydraulic, HVAC and other systems for the steam boiler in boiler room. It is expected that the workshop will meet the production requirements by the end of this year, and will greatly increase the vaccine production capacity of SINOVAC after it is officially put into use.

Quik link

Contact us

ADD : CNEEC BLDG., 9, SOUTH SHOUTI RD., HAIDIAN DISTRICT, BEIJING 100048 P.R.CHINA

TEL : (8610)68798899

FAX : (8610)68798000

E-MAIL : cneec@cneec.com.cn

Legal Notice| Site Map

Beijing ICP No. 17028836    Copyright©China National Electric Engineering Co., Ltd. , All Rights Reserved