Located in Denizli, in southwest of Turkey, the Adiguzel hydropower station has an installed capacity of 62MW, an average annual electricity generation of 280 GWh, a design head of 116m and a rated flow of 60m³/s, installed two 31 MW Francis units.
Ever since 1992, the power plant, constructed by CNEEC, has been in operation and performed perfectly well. It is highly appraised by the owner and is awarded excellent project in Asia.