• One-Stop Service Of WholeValue Chain
  • Our Service
  • Our Business
  • R & D And Test

Office Building of Ministry of Foreign Affairs of Equatorial Guinea

Release time:2009-05-06 Article source: Reading times: A+ A A-

In accordance with the Sino- Equatorial Guinea exchange of notes, this is an interest-free loan project included in the economic and technical cooperation agreement signed by two governments on May 4, 2005.

Located in Bata, Equatorial Guinea, the project consists of an office building, including auxiliary houses such as equipment room. This is a three-floor building with a total floor area of 4650m2. Constructing from April, 2007, CNEEC successfully finished the design project through design inspection, preliminary design and shop drawing. At present, the capping of the building has been finished and the whole project is expected to be finished by July, 2009.

Quik link

Contact us

ADD : CNEEC BLDG., 9, SOUTH SHOUTI RD., HAIDIAN DISTRICT, BEIJING 100048 P.R.CHINA

TEL : (8610)68798899

FAX : (8610)68798000

E-MAIL : cneec@cneec.com.cn

Legal Notice| Site Map

Beijing ICP No. 17028836    Copyright©China National Electric Engineering Co., Ltd. , All Rights Reserved