Dayaowan Bulk Grain Terminal, Dalian Harbor

Release time:2009-08-06 Article source: Reading times: A+ A A-

Built in 2000, phase 3 project of Dayaowan bulk grain terminal of Dalian Harbor is constructed for solving the increasingly serious problem of short storage capacity.

Located in Dayaowan, Dalian, this project, including 17 silos which are 33m high assembled steel plate structure with a diameter of 18.3m, is the first grain harbor that adopts steel silo, with a total capacity of 100,000 ton, 17silos of 5900 ton each and a handling capacity of 1000 ton per hour. CNEEC was responsible for supply of silos, temperature measuring apparatus and grain level indicators, installation of equipment, and fabrication and erection of silo top loading bridges.

Quik link

Contact us

ADD : CNEEC BLDG., 9, SOUTH SHOUTI RD., HAIDIAN DISTRICT, BEIJING 100048 P.R.CHINA

TEL : (8610)68798899

FAX : (8610)68798000

E-MAIL : cneec@cneec.com.cn

Legal Notice| Site Map

Beijing ICP No. 17028836    Copyright©China National Electric Engineering Co., Ltd. , All Rights Reserved